Waterproof construction should pay attention to several aspects

Author: ComeFrom: Date:2014/4/8 11:13:46 Hits:1861
In general, urban construction urban planning are inseparable from the construction and waterproofing work is work to be done . If , due to recent changes in the weather is capricious and often rainy, so each building and home capitals flowers do waterproofing work . Here, we tell you about a few aspects of carrying out the construction needs attention:
Note a construction management to prepare if they can bid, should immediately seize the moment and build the project manager and the organization directing the project construction management department to do the following preparations .
Precautions Second , the rapid construction tenders required organizational chart , organizational leaders and technical personnel in place, conduct tests, and contract technical tests . All participants are required to clear job responsibilities , the division of the people , and make and civil construction unit cohesion and coordination of construction work in the organizational units in order to ensure the smooth progress of the project.
Note III requirements on the basis of tenders further improve construction design work at the construction unit and site supervision for approval.
Precautions four , in the case of owners , site supervision , civil construction units and related units to participate in grass-roots inspection and acceptance .
Note V. familiar with the construction drawings, determine the project quality plan , construction plan, plan and schedule work instruction scheduling, and to determine the personnel and material supply plan in accordance with the actual situation , and make arrangements for temporary work in construction and production houses .
Precautions six , construction tools necessary to organize according to plan in place , on -site construction required to make the necessary debugging and inspection equipment to ensure the normal operation of construction equipment . According to the characteristics of the project construction period , all the tools , equipment must be ample supply , prepare full , get ready .
( 1 ) the implementation of material supply plan
In the case of on-site supervision engineers to participate effectively do materials approach of inspection , sampling inspection when necessary.
( 2 ) material preparation
According waterproof case designed to select the best material , the material selected to ensure quality.
( 3 ) Construction equipment
Construction unit according to the actual situation of the construction site requirements , auxiliary materials shall be used for materials in line with national industry standards , such as sealant , cold base oil. And shall be equipped with air compressors, pressure spray cans , gas gun , high pressure hair dryer, trowel , squeegee , belts, squares shovel , blender , brush, special flame gun , wallpaper knife , rope , rollers and other essential tools to facilitate the construction site .